
HVAC
The outcomes of any workspace depends on the quality of the HVAC system within it. Our goal is to improve everything from productivity to culture by delivering the highest quality commercial HVAC maintenance and repair services in our region. Our specialized process involves using local dispatching, respecting work schedules, executing follow up calls after every installation to receive feedback, and implementing third-party surveys. Our customers have come to trust that our commercial HVAC maintenance services are rooted in a continuum of safety, quality, and productivity.
Projects

Utah Hogle Zoo
The Utah Hogle Zoo, which is located in Salt Lake City, was interested in expanding its exhibits, specifically enhancing their Wild Utah Exhibit, which spans over 42 acres and is more than 90 years old. As a commercial entity and entertainment venue, the upgrade required our teams to work in a variety of settings to install industrial HVAC, plumbing, and controls systems.

West Jordan Community Arts
West Jordan City in Utah was building a new municipal facility that would eventually serve as a venue to host local art showcases and events. We were selected as the installation partner for all the buildings’ HVAC and plumbing systems.

University of Utah – Baseball Stadium
The University of Utah was looking to build a new baseball stadium on its campus in Salt Lake City. HVAC and plumbing systems were needed throughout the entire venue. We were selected to install all the mechanical systems for the stadium – from concessions to practice areas, dugouts, and locker rooms.

Granite School District
The Granite School District has several schools throughout Salt Lake County, ranging in grades K-12, and each facility in the district required HVAC, plumbing, and controls upgrades, as well as maintenance and repair to ensure optimal conditions for teaching and learning. We have vast experience in school settings, so we were selected to perform these updates.

Sodexo / Chevron
Our HVAC, plumbing, and controls services teams took on a service project to upgrade and repair a refinery in Salt Lake City. Built in 1948, this facility needed inspection and maintenance services from top to bottom, while concentrating on the refinery’s mission-critical equipment.

Pepperidge Farms
In the area of Richmond, Utah, sits an industrial Pepperidge Farms food processing plant. This large industrial complex was in need of expansion, necessitating the installation of all new HVAC and plumbing systems. The goal was to take the facility through a line expansion of 94,000 square feet, increasing the building’s total area to 225,000 square feet upon completion.

Ogden Clinic
Ogden Clinic has several buildings throughout the Wasatch Front. To date, we have completed several of the buildings, providing the highest-grade HVAC, plumbing, and controls equipment, and servicing existing equipment. From medical office buildings and corporate offices, all the equipment used was VRF equipment (Mitsubishi/LG/Daikin).

4Life
4Life, a pharmaceutical manufacturing company located in Salt Lake and Utah counties, required industrial HVAC, plumbing, and controls services to be performed for its buildings. This was an expansion project that would result in the addition of 155,000 square feet.

Salt Lake Community College – Student Center
Nestled in Taylorsville, Utah, you’ll find Salt Lake Community College, an institution with multiple campus locations across the Salt Lake Valley. Originally built in the 1960s, these campuses were in need of HVAC and plumbing upgrades and repairs.

Project Century (Carvana)
Project Century was a large design-build project involving plumbing, compressed air, and HVAC systems. The upfront engineering was collaborated with the MEP team utilizing BIM. The plumbing scope involved installing numerous floor mount toilets, urinals, lav sinks, and floor drains.

Rocky Mountain Power – PacifiCorp
With power plants and substations across Utah, Rocky Mountain Power relies on our expertise to deliver a range of specialty mechanical and maintenance services. Built on partnership, our efforts go beyond repairing and replacing chillers, rooftop units, refrigerant equipment, and exhaust fans. Responsive and thorough, we work diligently to maintain both optimal interior conditions and the customer experience at Rocky Mountain Power and throughout Utah.

Morgan Asphalt
The project at Morgan Asphalt was the installation of a large 55 nominal ton, roof mounted, packaged, VAV Ari conditioning system. The system included 31 VAV terminal units, with heating water coils. Medium pressure ducting was constructed of spiral formed steel to distribute air from rooftop units to VAV boxes.

Courtyard Marriott – Cottonwood
The installation at the Courtyard Marriott-Cottonwood involved our plumbing and HVAC teams installing the entire scope of the MEP drawings. The plumbing projects consisted of installing above- and below-ground piping, natural gas piping, and PVC condensates.

Lehi City Police Station
The Lehi City Police Station project consisted of two parts, building the physical Police Station Building as well as the Gun Range. The Police Station Building consisted of both HVAC and plumbing projects, where we installed a Variable Refrigerant Flow (VRF) system that included 58 fan coils, ERV’s, Branch Controllers, Outdoor Systems, Mini-Splits, Unit headers, and exhaust fans.

HealthEquity
This multi-story and phased tenant improvement project required us to completely install a new Variable Refrigerant Flow (VRF) System. Our LG factory-trained teams installed 108 fan coils, heat recovery boxes, remote condensers, and all necessary refrigerant piping for this project. Lastly, start-up, commission, and controls were performed and balanced for owner turnover and training.

Boeing
This successful HVAC addition to the customers’ existing machine shop was a turnkey project that included HVAC, concrete, structural, electrical and controls. We installed 3 large air rotation units, first installing concrete pads then building the units in place.

Edwards Lifesciences
Edwards Lifesciences, a medical technology company headquartered in Irvine, California operates a facility in Utah that required new installation of various HVAC and plumbing systems. As a repeat customer, we were very familiar with Area 5, where the HVAC part of the project took place.