At Rocky Mountain Mechanical, we are well-versed in a variety of DDC systems that precisely optimize building performance. Our building automation controls system services enhance efficiency as we install the highest-grade, best-in-class equipment. No matter how demanding the problem, we bring intelligent and safe control systems to these dynamic work environments.
Projects

Utah Hogle Zoo
The Utah Hogle Zoo, which is located in Salt Lake City, was interested in expanding its exhibits, specifically enhancing their Wild Utah Exhibit, which spans over 42 acres and is more than 90 years old. As a commercial entity and entertainment venue, the upgrade required our teams to work in a variety of settings to install industrial HVAC, plumbing, and controls systems.

Granite School District
The Granite School District has several schools throughout Salt Lake County, ranging in grades K-12, and each facility in the district required HVAC, plumbing, and controls upgrades, as well as maintenance and repair to ensure optimal conditions for teaching and learning. We have vast experience in school settings, so we were selected to perform these updates.

Sodexo / Chevron
Our HVAC, plumbing, and controls services teams took on a service project to upgrade and repair a refinery in Salt Lake City. Built in 1948, this facility needed inspection and maintenance services from top to bottom, while concentrating on the refinery’s mission-critical equipment.

Ogden Clinic
Ogden Clinic has several buildings throughout the Wasatch Front. To date, we have completed several of the buildings, providing the highest-grade HVAC, plumbing, and controls equipment, and servicing existing equipment. From medical office buildings and corporate offices, all the equipment used was VRF equipment (Mitsubishi/LG/Daikin).

4Life
4Life, a pharmaceutical manufacturing company located in Salt Lake and Utah counties, required industrial HVAC, plumbing, and controls services to be performed for its buildings. This was an expansion project that would result in the addition of 155,000 square feet.

Rocky Mountain Power – PacifiCorp
With power plants and substations across Utah, Rocky Mountain Power relies on our expertise to deliver a range of specialty mechanical and maintenance services. Built on partnership, our efforts go beyond repairing and replacing chillers, rooftop units, refrigerant equipment, and exhaust fans. Responsive and thorough, we work diligently to maintain both optimal interior conditions and the customer experience at Rocky Mountain Power and throughout Utah.

Morgan Asphalt
The project at Morgan Asphalt was the installation of a large 55 nominal ton, roof mounted, packaged, VAV Ari conditioning system. The system included 31 VAV terminal units, with heating water coils. Medium pressure ducting was constructed of spiral formed steel to distribute air from rooftop units to VAV boxes.

Courtyard Marriott – Cottonwood
The installation at the Courtyard Marriott-Cottonwood involved our plumbing and HVAC teams installing the entire scope of the MEP drawings. The plumbing projects consisted of installing above- and below-ground piping, natural gas piping, and PVC condensates.

Lehi City Police Station
The Lehi City Police Station project consisted of two parts, building the physical Police Station Building as well as the Gun Range. The Police Station Building consisted of both HVAC and plumbing projects, where we installed a Variable Refrigerant Flow (VRF) system that included 58 fan coils, ERV’s, Branch Controllers, Outdoor Systems, Mini-Splits, Unit headers, and exhaust fans.

Boeing
This successful HVAC addition to the customers’ existing machine shop was a turnkey project that included HVAC, concrete, structural, electrical and controls. We installed 3 large air rotation units, first installing concrete pads then building the units in place.

Edwards Lifesciences
Edwards Lifesciences, a medical technology company headquartered in Irvine, California operates a facility in Utah that required new installation of various HVAC and plumbing systems. As a repeat customer, we were very familiar with Area 5, where the HVAC part of the project took place.