This was a complex project including demo of old boilers and the installation of two new large boilers. The boilers were below ground level and needed to be rigged in and out of the building with skates. In addition to the installation of these boilers, was a large amount of piping to be installed and the coordination with the customer to mitigate downtime of their current system.