This was a complex project, including a demo of old boilers and the installation of two new large boilers. The boilers were below ground level and needed to be rigged in and out of the building with skates. In addition to installing these boilers, a substantial amount of piping had to be installed, and coordination with the customer was required to minimize downtime of their current system.