Southwest Spine

We installed the plumbing and med gas piping for Southwest Spine, a medical office building. The project consisted of a variety of different types of patient/doctor sinks, drains and lav’s. A new expansion tank, water heaters, water softeners and drinking fountains were included in the plumbing scope of this project.

Little America Hotel

This was a complex project including demo of old boilers and the installation of two new large boilers. The boilers were below ground level and needed to be rigged in and out of the building with skates. In addition to the installation of these boilers, was a large amount of piping to be installed and … Continued

Project Century (Carvana)

The upfront engineering was collaborated with the MEP team utilizing BIM. The plumbing scope involved installing numerous floor mount toilets, urinals, lav sinks and floor drains. In addition, multiple eye wash stations, icemakers, water heaters and janitorial sinks were installed. Two 1,500-gallon reclaim tanks were installed for the onsite carwash. The compressed air scope for … Continued

Rocky Mountain Power

Our work with Rocky Mountain Power at their main facility, powerplants and substations in Utah results in a continuum of service and covers a wide range of specialties. More than just repairing and replacing chillers, roof-top units, refrigerant equipment and exhaust fans, we offer a responsiveness that no one can match. To maintain optimal interior … Continued

Morgan Asphalt

The project at Morgan Asphalt was the installation of a large 55 nominal ton, roof mounted, packaged, VAV Ari conditioning system. The system included 31 VAV terminal units, with heating water coils. Medium pressure ducting was constructed of spiral formed steel to distribute air from rooftop units to VAV boxes. All supply air distribution was … Continued

Marriott Courtyard

The installation at the Courtyard Marriott-Cottonwood involved our Plumbing and HVAC teams installing the entire scope of the MEP drawings by Spectrum Engineering. The Plumbing projects consisted of installing above- and below-ground piping, natural gas piping, and PVC condensates. There were nearly 150 guest rooms that required ADA compliance (sinks, toilets, drains and showers). In … Continued

Lehi City Police Station

The Lehi City Police Station project consisted of two parts, building the physical Police Station Building as well as the Gun Range. The Police Station Building consisted of both HVAC and Plumbing projects, which saw us installing a Variable Refrigerant Flow (VRF) system that included 58 fan coils, ERV’s, Branch Controllers, Outdoor Systems, Mini-Splits, Unit … Continued

Health Equity

This multi-story and phased tenant improvement project was to completely install a new Variable Refrigerant Flow (VRF) System. Our LG factory-trained teams installed 108 fan coils, heat recovery boxes, remote condensers and all necessary refrigerant piping for this project. Lastly, start-up, commission and controls were performed and balanced for owner turnover and training.

Boeing

This successful HVAC addition to the customers’ existing machine shop was a turnkey project that included HVAC, concrete, structural, electrical and controls. We installed 3 large air rotation units, first installing concrete pads then building the units in place. Once in place, large refrigerant piping was run to the condensers. In addition, new VFD’s for … Continued

Edwards Lifesciences LLC

One of the numerous projects we have completed for this repeat customer was in Area 5 where we installed various HVAC and plumbing systems. The HVAC part of the project consisted of the installation of a Building Conditioned Air transfer and general system, including the installation and relocation of AAON roof top units with new … Continued